
Tunnel linking the towns of Schio and Valdagno
Junctions with the main road and accessory works through the construction of a natural tunnel 300 lm long, an artificial tunnel 600 lm long and a bridge over the river Agno with a span of 40 lm.
Junctions with the main road and accessory works through the construction of a natural tunnel 300 lm long, an artificial tunnel 600 lm long and a bridge over the river Agno with a span of 40 lm.