SS. 470 Val Brembana – Urgent works to reinstate safe road conditions
The lot includes the construction of 5 road tunnels for an overall length of 2,400 lm and open-air connection sections in presence of traffic.
For a development of around 800 lm, the tunnels have been carried out following consolidation of ground by the insertion of valved pipes.