Repair-work and widening of the left Leno stretch of the S.P. 89 from Aste to Ometto – Lot 2: Bruni-Zendri

Works to widen and rectify the existing road along a 2.2 kilometre stretch, including:

Moving materials

Opposite-bank walls and gravity support walls

Road superstructures and paving

 

Committente:

PROVINCIA AUTONOMA DI TRENTO

Anno di Realizzazione:

2004 - 2007