
S.P. BS 237 “DEL CAFFARO” – CONSTRUCTION DEVIANT VESTONE NORD – IDRO SUD
Final design and construction works of the variant to the S.P. BS 237 “Del Caffaro” in the section between Vestone Nord and Idro Sud, for a length of approximately 3.2 km.
The project includes:
- Construction of a roundabout in Idro at km 38+500.
- Construction of a straight bridge of approximately 44 m to cross the Chiese river
- New roundabout on the left bank of the Chiese river
- Road section parallel to the river with structures to cross the natural watersheds
- Monte Antegolo tunnel (900 m, single tube, two-way traffic)
- Crossing of the Chiese river with a second 65 m bridge
- Monte Coste tunnel on the right bank
- Connection with the S.P. BS 237 via a roundabout in Pieve Vecchia (Idro)