Rumania Autostrada Orastie-Sibiu Lotto 3
Construction of a stretch of motorway, which includes:
– tho parallel viaducts with metallic floor framework and reinforced concrete slab, including the foundations and piles. total lenght 1.014 m x 2 and pile height up to 77m
– floot framework of 7 flyovers and minor bridges