Rumania Autostrada Orastie-Sibiu Lotto 3

Construction of a stretch of motorway, which includes:

– tho parallel viaducts with metallic floor framework and reinforced concrete slab, including the foundations and piles. total lenght 1.014 m x 2 and pile height up to 77m

– floot framework of 7 flyovers and minor bridges

Committente:

IMPREGILO S.p.A.

Anno di Realizzazione:

2012 – 2013

Gallery: