Construction of the railway bypass of the City of Trento

The work mainly consists of two parallel single-track tunnels, each approximately 11 km long, and entrance works in an artificial tunnel.

The reconnection to the existing Verona – Brennero line takes place through stretches in trenches and closely flanked embankments.

Work done with : Webuild and Ghella

Committente:

Rete Ferroviaria Italiana in sigla RFI SpA

Anno di Realizzazione:

2023-2026

Gallery: