
Construction of the exploratory tunnel in the Aica – Mules stretch, including the Mules access tunnel
– Construction of the exploratory tunnel Ø 6.00 with full face TBM length 10.507 m.
– Creation of an access tunnel lenght 1.787 m, cross section 70 sq.m. via blasting.
– Creation of base camps
– Preparation of the Interegger and Mules landfill areas.
Works performed with: PIZZAROTTI – CONDOTTE – SELI – BILFINGER BERGER AG – ALPINE MAYREDER BAU