Design and execution of the open – air cutting of the Trento – Malè electric railway in the east section of Zambana Nuova, between km 8+050 and 9+900 approx.

– Reconstruction of the railway track on a 2.2 km stretch, with civil engineering works, technological facilities and superstructure.

– Works fot the deviation, re – arrangement and modification of the existing network.

Committente:

PROVINCIA AUTONOMA DI TRENTO

Anno di Realizzazione:

2005 - 2008

Gallery: