Design and execution of the open – air cutting of the Trento – Malè electric railway in the east section of Zambana Nuova, between km 8+050 and 9+900 approx.
– Reconstruction of the railway track on a 2.2 km stretch, with civil engineering works, technological facilities and superstructure.
– Works fot the deviation, re – arrangement and modification of the existing network.