Overland and Underground Railway of Milan – Lots 3P – 5P – 6P

The lot includes the building of various railway tunnels for an overall length of 4,000 lm created with mechanical boring machines of diameter of 8 lm and cladding in pre-fabricated shells, in loose ground.

Construction of 2 stations (Garibaldi and Lancetti) and air wells.

Work carried out together with Cogefar – Impresit – Torno – Lodigiano – CMB – Tettamanti – Progetti e Costruzioni

Committente:

METROPOLITANA MILANESE S.p.A.

Anno di Realizzazione:

1991 -1993

Gallery: