Genoa-Monaco oil pipeline

– 800 lm of tunnel through the mountains to the Bocchetta Pass (Ge) with section of 10 m Built in clay

– 1,500 lm of tunnel to Lirone (So) with 10 m section

Committente:

S.N.A.M. MILANO

Anno di Realizzazione:

1962 - 1965

Gallery: