Lot 13 Capo Calavà

– 2 tunnels for an overall length of 6,300 lm. In the central section the lot is crossed by a zone affected by pressurised toxic gases with special water-proofing treatments of the ground and special excavation methods

– Viaducts and open-air works

 

Committente:

AUTOSTRADA MESSINA - PALERMO S.p.A.

Anno di Realizzazione:

1971 - 1978

Gallery: