Works to rebuild the viaduct on the S.S. 43 della Val di Non – Grumo (TN)

Rebuilding of a railway overpass with a surface area of 700 m with demolition of the current structure, moving the road, renovation of the load-bearing structures and paving.

Work carried out without interrupting railway and road traffic.

Committente:

PROVINCIA AUTONOMA DI TRENTO

Anno di Realizzazione:

2005 - 2007

Gallery: