S. Massenza II hydroelectric power plant
– Construction of pressurized tunnel of the Ponte Pià dam for a development of around 2,500 lm with diameter 3 lm
– Collection and shunt works on the Rio Bondai, bridge over the canal crossing the Bondai valley and access roads.