Naturno (BZ) hydroelectric power plant

– 2.500 km of pressurised branch tunnel with section of 16 m²
– Piezometric shaft with height of 100 lm and expansion and feed chambers
– Open-air penstock 1,500 lm long with difference in level of 1,000 lm
– Open – ait hydroelectric power plant complete with bedplates for turbines
– External yards
– Outlet channel 300ml long

Committente:

A.E.C. – AZIENDA ELETTRICA CONSORZIALE – BOLZANO

Anno di Realizzazione:

1961 - 1963

Gallery: