Gargnano (BS) hydroelectric power plant
– 5.600 km tunnel through the mountains with 9 m² section
– 5.060 km of drainage tunnel with 6 m2 section
– 5.600 km tunnel through the mountains with 9 m² section
– 5.060 km of drainage tunnel with 6 m2 section