
Facility for the connection between the Pinzolo e Madonna di Campiglio – Trento ski resorts
Design and execution of works for the Pinzolo – Madonna di Campiglio cable car connection, which includes:
– 2 upstream stations, 2 intermediate stations and cable works lenght 5.000 m.
Work performed with: LEITNER – MISCONEL