Facility for the connection between the Pinzolo e Madonna di Campiglio – Trento ski resorts

Design and execution of works for the Pinzolo – Madonna di Campiglio cable car connection, which includes:

– 2 upstream stations, 2 intermediate stations and cable works lenght 5.000 m.

Work performed with: LEITNER – MISCONEL

Committente:

TRENTINO SVILUPPO S.p.A.

Anno di Realizzazione:

2010 – 2011

Gallery: