
Branch of water for irrigation purposes from the river Adda lot II – Medolago
– Construction of hydraulic tunnel for a length of 5,350 lm and Ø of 3.55 lm finished, carried out in loose grounds with protection and cladding in prefabricated shells
– Pumping station for a capacity of m /sec 1.5 and head of 50 lm
– Structure for crossing the river Dordo in underpass
– Hydraulic repairs to the river Dordo with side walls and bottom thresholds