
Branch of water for irrigation purposes from the river Adda lot 4 (Medalogo)
– Costruction of hydraulic primary feed tunnel with structure in reinforced concrete for a capacity of 10 m ³/ sec and an overall length of 14.000 lm
– Punping station and capacity branch for delivery to the existing secondary mains
– Road-motorway and railway crossing