Branch of water for irrigation purposes from the river Adda lot 4 (Medalogo)

– Costruction of hydraulic primary feed tunnel with structure in reinforced concrete for a capacity of 10 m ³/ sec and an overall length of 14.000 lm

– Punping station and capacity branch for delivery  to the existing secondary mains

– Road-motorway and railway crossing

Committente:

CONSORZIO DI BONIFICA DELLA MEDIA PIANURA BERGAMASCA E DELL'ISOLA - BERGAMO

Anno di Realizzazione:

1986 -1991

Gallery: