Construction of a new general warehouse for tools and vehicles – Lavis (Tn)
Carried out with structures in iron and prefabricated curtain walls – covered surface of 5,000 m and volume of 40,000 m
Carried out with structures in iron and prefabricated curtain walls – covered surface of 5,000 m and volume of 40,000 m