Construction of the road in the valley floor of the Valle di Fiemme between Ponte Lago and Ziano
Construction of road lot for a length of 5,000 lm including movement of materials, miscellaneous works, underground works and road superstructures.
The lot includes:
– A natural tunnel of 2,000 lm, 300 lm of which in loose earth with special works to consolidate the ground
– 3 bridges in metallic structure in corten steel
– A 300 lm long artificial tunnel
Work carried out together with Imprese Del Favero – Mazzotti e Pedrotti