Construction of the Link road between the S.S. 48 of the Dolomites and the S.P. in the valley floor of the Valle di Fiemme

Construction of road lot with a length of 3,200 lm including:

– Natural galleries for 800 lm

– 2 viaducts for 180 lm

– Moving materials, minor miscellaneous works and road superstructures

Work carried out together with Imprese Del Favero, GECO, Adige Bitumi

Committente:

PROVINCIA AUTONOMA DI TRENTO

Anno di Realizzazione:

1990 - 1991

Gallery: