
Bolzano Sud motorway link with the Bolzano-Merano freeway – lot B
Construction of motorway lot including:
– 2 natural tunnels for a length of 1600 lm
– Works
– Moving materials for 250,000 m
– Road superstructures and paving
Work carried out together with Imprese Del Favero and Wipptaler Bau